Commercial Interior Design and Fitouts in Sydney

Commercial fitouts for cafés, restaurants, shops, salons, clinics, gyms and offices across Sydney. We design the space, manage the approvals and coordinate with your builder through the fitout.

Our commercial interior design work in Sydney covers fit-out design and approvals for cafés, restaurants, shops, salons, clinics and gyms. We measure and design the tenancy, manage the change of use, DA or CDC and the landlord's sign-off, and coordinate your builder. Our drawings are detailed enough for several builders to price the same work. We work in English, Mandarin and German.

How we help

Paid first stepBefore you sign the lease checkCan your business go in the shop you've found? We check zoning, change of use, the existing approval, exhaust, grease trap, toilets, access, fire and power, and write up the red flags and a rough budget. The fee is credited against the design fee if you go ahead.
IncludedApprovals, part of every projectWe prepare and manage the approvals your fit-out needs, through to a decision. That can include a change of use, a DA or CDC, the food premises standard, fire and access, and the landlord's or shopping centre's design approval.

Sound familiar?

What small business owners most often run into, and how we approach each.

"We've signed the lease, and now council says we need a DA."

This happens often, and it can be fixed, but time matters once the lease is signed. First confirm the exact approval route, because some changes of use qualify for a faster complying development certificate (CDC). Design to that route from the start, and ask the landlord about rent-free time while the approval is assessed.

Book a free 15-minute call

"The landlord says a café is fine here."

The landlord can only speak for the lease; council decides what the shop can be used for. The NSW Small Business Commissioner is blunt: don't rely on what the landlord says about council regulations, because zoning and planning rules can change.

Before you sign the lease check

"The fit-out company will design it for free."

Free design is usually paid for inside the build price, which you can't compare with anyone else's. Ask what it includes and whether you can take the drawings to another builder.

What free design does and doesn't include

"We're taking over a café, so the approvals come with it."

Not automatically. City of Sydney tells anyone taking on an existing food business to make sure the premises has the right consent, and the last approval's conditions on hours, noise and parking apply to you too.

Before you sign the lease check

"The shopping centre has sent us its fit-out guide."

Read it with the lease and a budget. Under NSW retail lease rules, the fit-out standard must be written in a fit-out statement or guide, and you don't have to do work it doesn't include. The maximum cost of landlord's works must be agreed in writing before the lease begins.

Shops, salons, clinics and gyms

How it works

A free call, a paid first step that's credited if you go ahead, then a written proposal with a fixed fee per stage.

  1. Free 15-minute call

    By phone or video: your business, the site, opening date and budget. We'll say honestly whether we're the right fit.

    Free
  2. Before you sign the lease check

    Before you commit, we confirm the approval route, list the red flags and give you a rough budget and questions for the landlord. You receive a written summary to keep.

    Credited if you go ahead
  3. Written proposal

    We set out the scope, what you receive at each stage, what's excluded (construction, authority and consultant fees) and a fixed fee for each stage, all in writing.

    Fixed fee per stage
  4. Site measure and concept

    Measured plans of the tenancy, then a layout and look built around how you'll trade.

    Typically 2 weeks
  5. Design development and approvals

    The detailed design, consultants coordinated, and the change of use, CDC or DA and landlord approval lodged and managed to a decision.

    CDC: from 10 to 20 days · DA: 90-day target average (NSW, 2026)
  6. Documentation and builder quotes

    Drawings detailed enough for two or three builders to quote like-for-like.

    Typically 4 weeks
  7. Construction coordination

    We work with your builder and building management and check the finished space matches the design. Then the certifier issues the occupation certificate, where one is needed.

    Fixed fee per stage

Designer, fit-out company or builder: who does what

The right setup depends on your project. Here's what each option typically covers.

Design-and-construct fit-out companyBuilder or shopfitter to your drawingsIndependent designer (us)
Who designsThe company's designer; often called free, but built into the priceWhoever you paid to draw the plansWe do, for a fixed fee per stage
Comparing pricesOne price for everything, hard to compareEasy, if the drawings are completeSeveral builders price the same drawings
ApprovalsOften included in the packageUsually yours to arrangePrepared and managed by us
Who checks the workThe company checks its own workYou doWe check it against the design, on your side
Best forSimple, repeat fit-outs with a fixed brief and one point of contactA refresh where good drawings already existNew sites, a change of use, tricky approvals, a budget to protect

How each model typically works in Sydney. Firms differ, so ask any of them what's included and what isn't.

What a fit-out costs in total

Our fee is one line in a longer list. These indicative 2026 figures show the rest. A former café with a working exhaust and grease trap costs far less to fit out than a bare shell. See our fees for what each stage includes.

ItemIndicative rangeNotes
Our design and approvals feeOften around 15% of the fit-out cost, or fixed fees from about $15,000 for a small office (ex GST)Fixed per stage, in writing
Café or restaurant build$2,800 to $4,500 per m², typically about $3,700 (incl. GST)Kitchen, exhaust and services drive it
Shop or salon build$1,000 to $2,750 per m², typically about $2,000 (incl. GST)Shopfront, joinery, display, lighting
Services the site lacksFor example, about $9,500 for a grease trap and plumbing, or $11,000 for three-phase power (ex GST)The usual surprise
Council, certifier and authority feesVary with the council and the cost of worksEstimated in the lease check
Rent before you tradeYour rent, times the months before openingNegotiate rent-free time before signing
Make good when you leave$150 to $650 per m², typically about $400 (incl. GST)Whatever your lease says you must restore

What you can expect

We check what the site needs before you commit, design around how the business actually operates, manage the approvals and prepare drawings your builder can price and work from. We can stay involved through construction and opening.

Questions business owners ask

Who builds the fit-out?

A builder you choose. We design, manage the approvals and coordinate your builder, and you sign the building contract directly with them. Several builders can price the same drawings, and we check the work against the design on your behalf.

Can you look at a shop before I sign the lease?

Yes, and it's the best time. Our before you sign the lease check tells you whether your business can go there, which approval route applies, what the building lacks and roughly what the fit-out will cost. The fee is credited against the design fee if you go ahead.

How much does a fit-out cost per m²?

It depends on the site more than the finishes. A Sydney cost guide puts shop fit-outs at about $1,000 to $2,750 per m² and cafés or restaurants at about $2,800 to $4,500 per m², including GST. Services cause the biggest swings: one food business owner reported plumbing costs of under $5,000 in one shop and about $70,000 in another. See our café and restaurant cost guide.

How long from signing the lease to opening?

It depends on the approval route and the amount of building work. A CDC can take as little as 10 to 20 days when everything complies, and councils are expected to decide DAs within an average of 90 days. Add the design time before that and the build after it. See how long until we can open.

Do you work with franchise standards and shopping-centre guides?

Yes. No. 1 Malatang, Sushi Train Mortdale, Chambers Cafe and both Shook cafés are franchise sites where we fitted the brand to each tenancy. Central Eyecare in Punchbowl was designed within its shopping centre's design and tenancy requirements. We take designs through the centre's or landlord's approval as well as council's.

Is my project too small for an architect?

Not necessarily. Luana Hair & Beauty in Waterloo was a budget-conscious salon fit-out with minimal construction. Raised platforms took the hair-washing area, so the salon didn't need major plumbing work. Tell us about your project on the free call and we'll talk through what it needs.

Tell us what you are planning. In a free 15-minute call we will tell you honestly whether we are the right fit, what the approval route looks like and what the sensible next step is.