Guide · Homes

How to tell if a wall is load bearing, and what removing one needs in NSW

Written by Xiaoqing CaiSenior Architect · Updated October 2026 · 9 min read

To tell if a wall is load bearing, look for the signs: it's an outside, party or brick spine wall, joists or a roof strut rest on it, or another wall stands directly above it. No sign is proof, so a structural engineer confirms it and designs the beam. In NSW, removing or shifting an internal wall, load bearing or not, generally needs a CDC or a DA, plus an owners corporation vote in a strata scheme.

You can often tell if a wall is load bearing from clues in the house: where it sits, what it's made of and what rests on it. Only a structural engineer can confirm it, though, and in NSW removing or shifting an internal wall needs a CDC or a DA in most cases, even when the wall carries nothing.

It's often the first thing owners ask us, because every other idea for the bedroom or the kitchen depends on one answer: can these walls actually be moved?

How to tell if a wall is load bearing in a Sydney house

A load bearing wall carries weight from above (a floor, another wall, part of the roof) down to the footings. These are the signs we look for in a house:

SignWhat it suggests
An outside wall, or a party wall shared with next doorStructural
Another wall stands directly above it upstairsIt carries that wall
Floor or ceiling joists run across it and rest on itIt carries the floor or ceiling
A roof strut or a beam lands on it (look in the roof space with a torch)It carries part of the roof
Solid brick or stone, especially across the middle of the houseOften structural in older houses
Joists run alongside it and the roof is built from trussesPossibly not load bearing, but it may still brace the house

To find the joists under a timber floor, look at the boards: they run across the joists, and the lines of nails show where each joist is.

Terraces and semis

In a terrace, the party walls are structural and shared. Each owner owns the wall up to the boundary, and both houses rely on it for support. Internal brick walls often carry load too, especially the spine wall between the front and back rooms, the wall beside the stair and any wall with a chimney breast. Joist direction varies between houses, so check rather than assume.

Houses with a trussed roof

In a trussed roof, the trusses usually span between the outside walls, so the internal walls carry no roof load. But internal walls are often designed as bracing walls that stop the frame racking sideways in strong wind. Taking one out still needs an engineer's view.

Why only a structural engineer can confirm it

Because the signs can mislead both ways. A thin stud wall can hold up a beam hidden above the ceiling, and a thick brick wall can be doing less than it looks. An engineer traces the load down to the footings, decides whether the wall can go and designs what replaces it.

An inspection and report costs a few hundred dollars in NSW. My advice: ask the engineer to look at every wall on your wish list in the same visit. The answers often change the plan.

Can a smaller change give you the space instead?

Often. A common example in two-storey terraces: a short wall beside the main bedroom's robe sits over the stair void. Pushing it out over the void makes the robe deeper with a small framing job, provided the engineer agrees the wall carries nothing.

The catch is the stair below. The building code requires at least 2.0 m of headroom over a stair, measured straight up from the line joining the front edges of the treads. So the robe can grow only as far as the headroom allows, and the drawing starts with a section through the stair.

Another small change is to shift the bedroom doorway out towards the corridor, so the door swings outside the room. In a small bedroom, the arc a hinged door sweeps is floor you can't use. A cavity slider does a similar job, and our guide to making a small house feel bigger covers the options. Changes like these rarely need a beam. They still change the layout, though, and that matters for approval.

What does removing a load bearing wall involve?

A typical job runs in this order:

  1. The engineer designs the beam, posts and footings, and the CDC or DA is issued.
  2. Steel props hold up the floor or roof while the wall comes out.
  3. A steel or engineered timber beam goes in, either below the ceiling as a bulkhead (simpler) or flush with it (neater, but more work).
  4. Each end of the beam sits on a post or pier, and that load has to reach the ground. An upstairs post can need a post and a new footing below it.
  5. The builder makes good the plaster, floor and paint, and relocates any power points or pipes that were in the wall.

If the beam bears on a party wall, your neighbour is involved. The City of Sydney encourages owners to get the neighbour's consent and typically requires an engineer to certify the party wall's stability. Have old linings tested for asbestos first, because NSW's asbestos authorities warn that homes built before 1990 can have it in interior walls. And the work needs a licensed builder once labour and materials pass $5,000 including GST.

How much does removing a load bearing wall cost?

These figures come from online price guides, and quotes for your house will differ:

ItemIndicative costWhere the figure comes from
Engineer's inspection and report$400 to $900A quote-comparison site's NSW guide, 2026
Engineer's design for one beamAbout $500 to $2,000The same NSW guide ($500 to $1,500); a national trades marketplace (average $1,900 ex GST, 2026)
Removing the wall, builder's price$5,000 to $15,000The quote-comparison site's NSW renovation guide

The certifier's or council's fee comes on top. Expect the top of the range or more for a long opening, a flush beam, a brick wall carrying a floor above, a party wall, or a post that needs a new footing. Get the engineer's design before asking builders to price, so every quote is for the same beam.

Do you need council approval to remove an internal wall in NSW?

Usually, and the wall doesn't have to be load bearing for that to apply.

Exempt development needs no approval, but it covers only minor internal work, such as replacing kitchen cupboards, bathroom fittings or flooring. It can't permanently change the building's load-bearing capacity, and under the state's exempt standards it can't change a room's layout by removing a wall or partition, even one that carries nothing.

So most wall changes go through a complying development certificate (CDC) under the Housing Alterations Code, which allows new openings, doors and changes to the floor layout of an existing home, terraces and townhouses included. A council or a registered certifier issues it, based on the engineer's design. A development application (DA) is needed if the work misses a CDC standard, or if the house is a heritage item, where structural changes inside need council's consent.

What you want to doUsual route
Replace kitchen cupboards, bathroom fittings or flooring, no wall changesOften exempt, if every standard is met
Shift, remove or add a non-load-bearing wall, or make a new doorwayCDC or DA
Remove a load bearing wall and put in a beamCDC or DA, with the engineer's design
Internal changes in a heritage conservation areaOften a CDC
Structural change inside a heritage itemDA
Any of the above in a strata schemeThe owners corporation's approval as well

A certifier can confirm the route before you start. Our CDC or DA guide explains both, and our heritage conservation area guide covers older streets.

What if the terrace is in a strata scheme?

Then the owners corporation has to approve the work too, as a separate step from council. NSW strata rules treat changes to internal walls as a minor renovation, approved by a vote at a strata meeting. Moving a structural internal wall is a major renovation, which needs a special resolution and written notice before work starts.

Don't assume a wall inside your lot is yours alone to change: the strata plan and the by-laws decide. Our guide to strata renovation approval in NSW explains the votes.

What this means for you

Find out which walls can go before you pay for a design that depends on them. And before you knock two rooms into one, read our guide to floor plan mistakes: a wide opening with sliding doors sometimes works better than no wall at all.

  • List the walls you'd like to remove, shift or open up.
  • Find out whether the house is a heritage item or in a conservation area. Your Section 10.7 planning certificate says.
  • If the house is strata titled, read the by-laws and the strata plan.
  • Have an engineer look at every wall on the list in one visit.
  • Have the CDC or DA, and any strata approval, before demolition starts.

When the wall is part of a bigger change, our feasibility study checks the approval route for your house, including heritage, and lists the consultants you'll need, such as a structural engineer. At The Residence in Baulkham Hills, where we designed the renovated interiors, the new open-plan living, dining and kitchen went through a CDC. See how we approach renovations and extensions.

Questions people ask

Do I need a structural engineer to remove a wall?

For a load bearing wall, yes. The engineer designs the beam and its supports, and the approval relies on that design. For a wall that looks non-structural, an inspection is still worth it if there's any doubt, because stud walls can carry more than they seem and internal walls often brace the house. An inspection and report costs a few hundred dollars in NSW.

Do I need council approval to remove an internal wall in NSW?

In most cases, yes, even if the wall carries no load. Exempt development doesn't allow a room's layout to change by removing a wall, so the work needs a complying development certificate (CDC) under the Housing Alterations Code, or a development application (DA). A heritage item needs a DA, and a strata scheme needs the owners corporation's approval as well.

How much does it cost to remove a load bearing wall in Australia?

NSW price guides put a typical job at about $5,000 to $15,000, plus about $500 to $2,000 for the engineer's beam design, and the certifier's or council's fee. Long openings, flush beams, brick walls carrying a floor and new footings push it higher.

Do I need an architect to remove a wall?

Not for a single wall: an engineer, a certifier and a licensed builder can handle that. An architect earns the fee when the wall is part of a bigger change, such as reworking how the rooms connect, fitting a robe or bathroom around new walls, a heritage house, or a strata scheme where the owners approve the plans. Our guide to who to call first compares the options.

Is a party wall load bearing?

In a terrace or semi, treat it as structural. It usually supports parts of both houses, each owner owns it up to the boundary, and both have rights to its support. It's also the fire wall between the houses, so the building code limits what can be built into it. Work that relies on it involves your neighbour, and usually an engineer's certificate.

Sources

Tell us what you are planning. In a free 15-minute call we will tell you honestly whether we are the right fit, what the approval route looks like and what the sensible next step is.

An OIC architect going over plans with three builders on a construction site