Opening a training centre in a Sydney warehouse, industrial unit or office usually means a change of use development application (DA), even when no wall comes down. Training is a different use, and the building is then assessed against the rules for an education use, so the job is to plan the few changes that use needs. Most spaces can be made to work.
Our worked example is a recent project for a private college that is a registered training organisation (RTO). It leases a unit in a Sydney industrial strata building and wants to teach on the warehouse floor and keep the offices upstairs.
Which planning use is a training centre?
Council's local environmental plan sorts businesses into defined uses, and each zone allows some and not others. Training can fit more than one.
| Planning use | What it covers | Usual zones |
|---|---|---|
| Industrial training facility | Vocational training tied to an industry, such as forklift driving, welding or carpentry | Industrial. The standard E4 General Industrial table permits it with consent |
| Educational establishment | A school, or a university, TAFE or similar institution set up under an Act | Schools: see below |
| Business or office premises | Services to the public, or administrative and professional work | Commercial and mixed use |
Council decides which definition applies; your zone's land use table says whether it's allowed. In an industrial unit, "industrial training facility" is often what makes hands-on training permissible, so describe the training precisely (what's taught, the equipment, hours and numbers) and put it to council's planners before the drawings are final. Our guide to change of use in NSW explains the general process.
Does a training centre need a DA, or can it use a CDC?
A change of use is exempt only within set groups: shops, offices and business premises, or general and light industry, packaging and warehouses. A warehouse becoming a training centre leaves both groups, so it needs approval.
A complying development certificate (CDC) can be approved in as little as 10 to 20 days, but only for uses on NSW Planning's list of specified purposes. The list names commercial premises, industries and information and education facilities, and leaves out educational establishments and industrial training facilities. So most training centres in industrial units need a DA, as ours did. Classroom training accepted as business or office premises could suit a CDC if every standard is met; a certifier can tell you early.
What goes into a change of use DA for a training centre?
Every DA needs an SEE, the owner's consent and a cost estimate. For a training centre, plan on this:
| Document | What it does | Usually prepared by |
|---|---|---|
| Drawings | Existing and proposed plans | The architect |
| Statement of environmental effects (SEE) | The use, hours, numbers, parking and waste, tested against the planning controls | The architect or a town planner |
| Waste management plan | Bins, types of waste and collection | The architect or a waste consultant |
| Plan of management | Sessions, timetable and the most people on site at once | The operator, with the architect |
| Building code (BCA) report | The building tested against its new class | A BCA consultant |
| Owner's consent | The landlord, plus the owners corporation if common property is affected | The owner and the strata manager |
City of Sydney, for one, also asks for an energy (Section J) report when the new use is non-residential. On our project we prepared the drawings, SEE and waste plan and brought in the BCA consultant. The college worked with us on the plan of management and the owner's consent. Much of our work was keeping every document consistent.
Why are student and staff numbers the first thing to pin down?
The building code counts people by floor area and use, and the exits and toilets are sized from that count. The NSW table counts storage at 30 m² per person, a trade and practical teaching area at 5 m² and a general classroom at 2 m². So a 200 m² floor holds about 7 people as a warehouse, 40 as a trade training area and 100 as a classroom. Same floor, same walls.
The code also accepts "any other suitable means of assessing its capacity", which is where a capped number helps. The college planned three groups of about 11 students, each with around four staff, one group per session. With the BCA consultant we set a maximum of 20 people at once, staff included, and wrote it into the plan of management. How the count becomes toilets is in our guide to how many toilets a training centre, school or office needs.
How did we make one warehouse unit work for a college?
The unit has an open warehouse floor with offices on a mezzanine above. The plan was to change almost nothing, and each requirement got its own answer.
| What came up | How we met it |
|---|---|
| A lease, so as few alterations as possible | The layout stays: the open floor for training, the existing upstairs rooms as offices |
| Warehouse (Class 7b) became Class 9b | Our BCA consultant assessed the unit as Class 9b, and we kept the drawings and documents in line with that assessment |
| One accessible bathroom fell short: the consultant advised an extra urinal and separate student and staff facilities | A urinal cubicle and a basin on the mezzanine, directly above the bathroom, so the new pipes and ventilation connect to the services below. The student and staff split went into a proposed performance solution |
| How many people at once | A cap of 20, in the plan of management |
| A full-height cubicle could have needed sprinkler changes | Partitions about 2,200 mm high, with a 500 mm gap below the ceiling. The certifier advised the sprinklers could stay as they are, and the fire consultant followed that advice |
| Plumbing through the mezzanine slab, which is common property | A special resolution of the owners corporation and a common property rights by-law covering the fittings, their upkeep and the exhaust connection |
| No lift to the mezzanine | A proposed performance solution for access between the levels |
| Exits | Paths of travel kept clear, travel distances checked |
A performance solution meets the code's performance requirements without following its standard provisions, and the certifier has to accept it. Our guide to Class 9b building requirements in NSW covers these in detail.
The strata approval needs the most time, with its own meetings and a by-law to draft. In my view it belongs in the first week: ask the strata manager whether the work touches common property and start then, so it runs alongside the DA documents. Our guide to strata approval for works on common property explains how.
What does ASQA expect of an RTO's premises?
Standard 1.8 says an RTO's facilities must be "fit-for-purpose, safe, accessible and sufficient". ASQA's practice guide adds that they comply with health and safety requirements and building codes, are large enough for your students and have enough amenities, such as toilets and disability access.
ASQA doesn't check the building code itself: the approvals for each training site are the RTO's responsibility. For international students, adding a delivery location needs the lease and occupancy certification showing the premises suit educational use, and ASQA uses that approval when it sets the site's student capacity. So the student number in your DA carries through to what ASQA approves there.
Is a school a different route?
Yes. A non-government school is registered by NESA, with applications due by 31 March in the year before it opens, and NESA wants written evidence that the premises are approved for that purpose. Schools also have their own state planning policy, which NSW Planning says doesn't cover tutoring centres, cooking schools or art schools.
A planning checklist for opening a training centre
Ask these in the first week; the answers set the order of work.
Ask the agent or the owner
- What are the zone and the approved use, and can you send the current consent?
- Will the owner sign the DA, and does the lease allow an extra toilet or partitions?
Ask the strata manager
- Which parts of the building (slabs, pipes, exhaust) are common property?
- Does the owners corporation need to sign the DA consent?
- When is the next general meeting?
What each step adds in time
| Step | Time to plan for |
|---|---|
| Use and class confirmed | Before the drawings are final; often more than one round |
| Strata approval | At least one general meeting (7 days' notice, 14 for an AGM), plus drafting the by-law |
| DA | Councils should lodge within an average of 7 days and decide within an average of 90 (the 2026/27 target) |
| After approval | A construction certificate, the work, then an occupation certificate before training starts |
What this means for you
- Write down your peak numbers and hours, and get the zone and the current consent.
- Have council confirm the use, a certifier or BCA consultant the class, and the strata manager the common property.
- Design the smallest changes that meet each requirement, and lodge one package in which every document agrees.
Most warehouses, industrial units and offices can be made to work for training, and bringing us in early means the time and cost are known from the start. Our pre-lease check gives a written answer: the approval route, what the existing approval allows, the issues sorted by what stops the project, adds cost or needs care, a rough budget range and questions for the landlord or agent. It's charged at our hourly rate and credited against our design fee if you go ahead on that site. Already signed? Book a free 15-minute call. See also our office and training room design service and lease checklist.
Questions people ask
How do you start an RTO in Australia?
Most RTOs register with ASQA, the national vocational training regulator, and must show they meet the Standards for RTOs, including fit-for-purpose facilities. The application asks for evidence such as photographs, floor plans, the lease or title deeds, and assessors can ask to see the premises. Get the space approved for training while the application is prepared.
How much does a change of use cost in NSW?
Council's fee is the small part. The 2026/27 state maximum is $395 for a DA with no building work. For work estimated at $5,001 to $50,000 (incl. GST) it's $235 plus $3 for each $1,000 over $5,000, so $310 for $30,000 of work. Notification can add up to $1,532. Drawings, reports and any building work cost more, so ask each consultant for a fixed quote.
Do I need council approval to run training from a warehouse or office?
Usually, yes. Training in a warehouse falls outside NSW's exempt change of use groups. Classroom training in an office can sometimes count as office or business premises, but council decides, and the building code can still treat the space as Class 9b. Ask a certifier before the fit-out is designed.
Sources
- Change of use (exempt development), NSW Planning Portal, updated 20 June 2023
- Complying Development for Business and Industry: A Pocket Guide, NSW Department of Planning and Environment, May 2023
- Check document requirements for a development application, City of Sydney, accessed 25 November 2026
- Provide owner's consent when making a development application, City of Sydney, accessed 25 November 2026
- Schedule of planning and development fees and charges for 2026/27, NSW Department of Planning, Housing and Infrastructure, June 2026
- Statement of Expectations Order, NSW Department of Planning, updated 2 July 2026
- NCC 2022 Volume One, Part D2 Provision for escape (D2D18 and NSW Table D2D18), Australian Building Codes Board, accessed 25 November 2026
- Practice Guide: Facilities, resources and equipment, ASQA, updated 29 October 2026
- ESOS documentation requirements, ASQA, updated 22 April 2026
- Strata renovation rules, NSW Government, updated 22 June 2026