A warehouse used for training can usually stay much as it is. The change of class asks for a known number of people, clear exits, toilets for students and staff, and access to every level, and each has an established answer. The Class 9b building requirements in NSW come from the National Construction Code (NCC), and NCC 2022 is the edition in force here until NCC 2025 starts on 1 May 2027.
What is a Class 9b building, and why does a training space become one?
The building code sorts buildings by use. A warehouse is Class 7b and an office Class 5. Class 9b is an assembly building, where people gather for social, theatrical, political, religious or civil purposes, and the code's examples include schools, universities and sporting facilities, which is why our gym fit-out guide mentions it.
A floor where enrolled students are taught in groups works more like a school than a store, and on our project it was assessed as Class 9b. The certifier decides the class. The planning side is covered in our guide to opening a training centre in Sydney.
Class 9b building requirements in NSW: what changes, and how each is met
The biggest change is the head count. The code allows 30 m² per person for storage and 2 m² in a school classroom, so a 150 m² floor holds 5 people as a warehouse and 75 as a classroom. Exits, toilets and lighting follow from that number, unless capacity is set another suitable way, such as a cap.
| Requirement | What Class 9b asks | How it's usually met |
|---|---|---|
| Number of people | Counted from floor area, or another suitable way | A maximum in the plan of management |
| Exits | Two exits from any storey or mezzanine with more than 50 people; no point more than 20 m from an exit, or 40 m from one of two | Keep each level at 50 or fewer, or use a second existing door, and keep paths clear |
| Fire resistance | In a two- or three-storey building, a more fire-resistant type of construction than a warehouse | The BCA consultant checks what the building was built to; in the highest type, warehouses already need more. Any gap is upgraded or covered by a performance solution |
| Sprinklers and smoke control | Not triggered by a training space alone; they follow height, large fire compartments and uses such as theatres | Keep existing coverage working when rooms are added |
| Emergency lighting | In every room the public uses once the storey is over 300 m², among other triggers | Lights and exit signs added where triggered |
| Access between levels | Access to all areas people normally use; the lift concession for small upper floors covers offices, shops, warehouses and factories only | A lift or platform lift, or a performance solution |
| Toilets | Under the school table, students and staff are separate groups | A cap on numbers, fixtures over existing services, or a performance solution |
Your BCA consultant confirms which rows apply; our fire safety guide covers the certificates.
How we met the requirements on a recent project
A private college we're working with, a registered training organisation, leased a two-level unit in a Sydney industrial strata building, with a light industrial warehouse below and offices above. It wanted the open floor for hands-on training, one group of about a dozen students at a time, and the offices kept as they were. So we planned to change almost nothing.
The BCA consultant we engaged assessed the use as Class 9b, and the assessment became our work list. The one accessible unisex bathroom wouldn't cover the new use alone: students and staff needed separate facilities, plus an extra urinal. The upper level has no lift. And the exits had to be confirmed for the new class.
A cap on numbers
With the BCA consultant we set a maximum of 20 people at a time, students and staff together, and wrote it into the plan of management. The assessment works from that number, well under the 50-person line for a second exit.
Toilets over the existing services
We placed a urinal and a basin upstairs, directly above the existing accessible bathroom, so the plumbing and exhaust connect to the services below, and proposed a performance solution for the student and staff split. Our guide to how many toilets a training centre needs explains the counts. The pipes pass through a common-property slab, so we worked on the owners corporation's approval alongside the DA documents (see strata approval for works on common property).
A partition height that left the sprinklers alone
Full-height cubicle walls could have formed a separately enclosed room and meant changes to the existing sprinklers. So early on we put a proposal to the certifier: walls about 2,200 mm high, stopping 500 mm below the ceiling. The certifier advised that the sprinkler system wouldn't need changes, and our fire consultant followed that view, so we didn't commission a fire engineering report or drawings for it. A self-closing door gives privacy, and the exhaust joins the existing system below.
I'd do the same in any sprinklered building: put a specific proposal to the certifier before the drawings are finished.
The upper level, the exits and the paperwork
We proposed a performance solution for access between the levels. The existing exits stay, with paths of travel kept clear and within the travel distances. Several rounds then brought the BCA report, the drawings and the plan of management into line. This is what we found and proposed while preparing the DA.
Does the rest of the building have to be upgraded?
Not necessarily all of it. In NSW the building must meet the core fire safety provisions for its new class, such as hydrants, sprinklers, smoke control and emergency lifts where its class and size call for them. Council or the certifier checks that. If building work is involved and the existing fire safety measures are inadequate, council also considers whether to require the building to be brought partly or fully up to the current code (section 64 of the Environmental Planning and Assessment Regulation 2021). Then, before the new use starts, the certifier issues an occupation certificate.
The upgrade can be partial. A BCA report lists what the new use needs, and council can make those items conditions of consent; one report lodged with a NSW council for a change to Class 9b recommended partial conformity with a list of works. That's why we get the BCA assessment first, so the upgrade items can be priced.
What is a performance solution, and how is one approved?
Most designs follow the code's deemed-to-satisfy provisions, its ready-made rules. A performance solution meets the code's performance requirements another way, and must show that it does, or that it's at least equivalent to the ready-made rules. The NCC sets four steps:
- A design brief agreed with the people involved, including the certifier.
- The analysis, for example expert judgement or a comparison with the ready-made rules.
- An evaluation against the agreed criteria.
- A final report, which the certifier uses to assess the solution.
An NCC performance solution example from the Australian Building Codes Board (ABCB) is a 60 m² shop whose only entrance has a 285 mm step. A ramp to the ready-made rules needed a landing that cut into the shop, so the designer proposed one straight ramp beside an existing wall and took it through the four steps.
Fire solutions in NSW add a step: Fire and Rescue NSW is consulted on the brief and reports to the certifier. That adds time, so we keep a fit-out inside the standard fire rules where we can, as the cubicle did.
What does a BCA consultant do, and who else is involved?
A BCA consultant assesses the design against the Building Code of Australia (the building volumes of the NCC) and writes the BCA report that councils such as the City of Sydney ask for with a change-of-use DA. It shows what complies and how each gap can be resolved.
The certifier, a registered certifier or the council, is the independent regulator who issues the construction and occupation certificates. The ABCB says a certifier shouldn't be asked to design your solution, since they then assess it, but they can say whether a specific proposal complies. That's how our partition height was settled.
A fire safety engineer prepares fire performance solutions, and an access consultant prepares the access ones. We bring them in and carry their advice into our drawings and the application.
What this means for you
Most warehouse units can be made to work as a training space, and the time and cost are easier to plan once the requirements are known. Start with these:
- Ask the certifier or a BCA consultant to confirm the class of the training use
- Decide the most people you'll have at once, staff included
- Get the fire safety schedule and latest annual fire safety statement from the landlord
- Have the BCA assessment done before the layout is fixed
- Put new toilets near the existing plumbing, and ask the strata manager about any work through common property
- Take any new wall or ceiling in a sprinklered building to the certifier early
If you've found a unit, our pre-lease check gives you a written answer: the approval route, the issues sorted by what would stop the project, what adds cost and what needs care, and a rough budget range. If you've already signed, start with a free 15-minute call, and see how we design offices and training spaces.
Questions people ask
What are the fire requirements for a Class 9b building?
For a training space they come down to exits and travel distances, emergency lighting and exit signs, and the building's existing fire services kept working. Sprinklers and smoke control follow height, large fire compartments or uses such as theatres and childcare centres, so a small training floor rarely adds them.
What are the toilet requirements for a Class 9b building?
Where the school table applies, as on our project, male and female staff and male and female students are counted as separate groups, and a urinal is needed from the first male student. Other Class 9b buildings let staff and the public share toilets; schools keep them apart. On our project, a cap of 20 people and a urinal over the existing bathroom kept the works small.
Is a training room in an office a Class 9b building?
It depends on its size. If the training room takes up less than 10% of the floor area of its storey, the code lets the office class, usually Class 5, apply to the whole storey. A larger training area is classified on its own. Ask the certifier early, because the answer sets the exits, toilets and access.
Sources
- NCC 2022 Volume One, Part A6 Building classification, Australian Building Codes Board
- Understanding the NCC: Building classifications, Australian Building Codes Board, May 2022
- NCC 2022 Volume One, Part D2 Provision for escape, Australian Building Codes Board
- NCC 2022 Volume One, Part D4 Access for people with a disability, Australian Building Codes Board
- NCC 2022 Volume One, Part A2 Compliance with the NCC, Australian Building Codes Board
- Performance Solution Process handbook, Australian Building Codes Board, September 2024
- Case study: Accessible entrance, Australian Building Codes Board, May 2021
- Performance solutions, Fire and Rescue NSW, 2026
- How to comply with the National Construction Code, NSW Government, May 2026
- Fire safety, Inner West Council, September 2026